Kenya’s government has taken a major step toward restoring momentum in its road and transport infrastructure development by settling KSh 93 billion in long-standing arrears owed to contractors across the country. The payments were facilitated through part of a KSh 104 billion syndicated loan sourced from commercial banks, which served as a bridge facility while the government prepares to launch a larger road bond aimed at refinancing the debt and providing sustainable funding for ongoing and future road construction.
The clearance of arrears marks a strategic shift in how Kenya intends to manage infrastructure financing, particularly in a period where public debt sustainability and investor confidence are under heightened scrutiny. The settlement allows the government to unblock numerous stalled and delayed road projects, some of which have been dormant for months, leading to mounting losses for contractors, layoffs among construction workers, and rising frustration among local communities waiting for essential road connectivity.
Build the future you deserve. Get started with our top-tier Online courses: ACCA, HESI A2, ATI TEAS 7, HESI EXIT, NCLEX-RN, NCLEX-PN, and Financial Literacy. Let Serrari Ed guide your path to success. Enroll today.
The beneficiaries of the arrears clearance include contractors under key agencies: the Kenya National Highways Authority (KeNHA), the Kenya Rural Roads Authority (KeRRA), and the Kenya Urban Roads Authority (KURA). These agencies are crucial in managing national, rural, and urban road networks, respectively.
To secure longer-term financing, the government is in the advanced stages of structuring a KSh 175 billion infrastructure bond, which will be backed by the Road Maintenance Levy Fund—a revenue stream collected through the fuel levy and administered by the Kenya Roads Board. The Board’s mandate and revenue allocation model are outlined under the Kenya Roads Board Act, which ensures that maintenance financing is directly drawn from fuel consumption.
This upcoming bond represents the government’s effort to transition from unpredictable exchequer allocations and short-term borrowing toward a more structured and predictable infrastructure financing model. According to officials at the National Treasury, the arrangement seeks to guarantee investor confidence by tying bond repayments to a reliable and traceable revenue source.
Why Clearing Arrears Matters for the Economy
The settlement of KSh 93 billion in pending contractor payments is already having measurable effects on the economy. Recent financial data referenced by the Central Bank of Kenya indicates a 21.7% increase in lending to construction-related firms, which saw their credit access grow to KSh 159.6 billion. Additionally, cement consumption jumped by 23.9%, signaling strong resumption of physical construction works that had been halted.
The resurgence in road construction activity has spillover economic benefits in areas such as:
- Employment restoration in civil works and construction labor
- Increased demand for local manufacturing inputs, including steel, concrete, and bitumen
- Improved logistics efficiency for agriculture and manufacturing once roads are completed
These growth indicators also contributed to Kenya’s GDP expanding by 5.0% in the second quarter of 2025, up from 4.6% previously. Improved infrastructure spending generally acts as a catalyst for broader economic improvement, particularly in a country where logistics bottlenecks significantly influence market pricing, access to agricultural hubs, and manufacturing competitiveness.
Strategy Behind the Upcoming KSh 175 Billion Road Bond
The planned infrastructure bond will be secured through revenue collected via the Road Maintenance Levy, which is applied to every liter of fuel sold within the country. The levy was recently reviewed upward to create a stronger revenue base capable of sustaining repayment obligations. Details of this revenue source are documented in periodic fuel levy updates published on the Kenya Roads Board’s revenue reports.
Investors are expected to be attracted to this bond due to:
- Predictable and earmarked revenue streams
- The government’s demonstrated commitment through upfront arrears clearance
- The historical performance and market appetite for infrastructure bonds in Kenya’s fixed-income markets
However, the bond’s successful issuance will depend heavily on investor sentiment, particularly institutional investors such as pension funds, insurance firms, and international development finance institutions. Should market confidence waver, the government may face higher borrowing costs or limited subscription, which would place further strain on public finances.
One decision can change your entire career. Take that step with our Online courses in ACCA, HESI A2, ATI TEAS 7, HESI EXIT, NCLEX-RN, NCLEX-PN, and Financial Literacy. Join Serrari Ed and start building your brighter future today.
Fiscal Risks and the Importance of Sustained Discipline
Despite this progress, Kenya’s broader public arrears remain substantial, estimated at approximately KSh 526 billion as highlighted in recent expenditure statements reviewed by the Parliamentary Budget Office. These arrears extend beyond infrastructure and affect suppliers and service providers in multiple sectors.
This means that the clearance of road arrears, while significant, does not resolve the systemic fiscal discipline challenges the government faces. To maintain momentum, policymakers will need to:
- Strengthen planning and scheduling of capital projects
- Adopt stricter procurement controls to avoid scope inflation and contractor claims
- Improve disbursement predictability to minimize project stoppages
- Ensure transparency in the utilization of the Road Maintenance Levy
Failure to sustain these improvements could result in a repeat accumulation of arrears, undermining both contractor confidence and infrastructure delivery objectives.
Broader Policy Context: Restoring Credibility in Public Infrastructure Delivery
The arrears clearance occurs at a time when restoring trust among contractors, financiers, and the public is critical. Many firms have previously reduced operations or slowed mobilization due to uncertainty around government payments. The arrears backlog also posed labor risks, with some companies downsizing workforce numbers or halting trainee and apprentice programs.
Agencies such as KeNHA and KeRRA are also under increasing pressure to adhere to performance metrics, cost-efficiency frameworks, and accountability requirements, especially as the country enhances oversight under the Public Procurement and Asset Disposal Act.
Continued improvement in the governance of project selection and contractor management may help Kenya access more favorable financing in the future, particularly through sovereign infrastructure bonds and structured public-private partnerships.
Conclusion: A Step Forward, With Conditions Attached
Paying KSh 93 billion in road arrears is a decisive move that unblocks stalled construction, stimulates the economy, and signals Kenya’s intention to stabilize its infrastructure project pipeline. However, the sustainability of this effort will depend heavily on the successful issuance of the upcoming KSh 175 billion road bond and the disciplined management of the Road Maintenance Levy fund.
If the government maintains transparency, spends efficiently, and avoids accumulating new arrears, this approach may represent a structural step forward in Kenya’s infrastructure financing strategy. If not, the gains made could easily unravel.
For now, momentum has returned—but continued discipline will determine whether it endures.
Ready to take your career to the next level? Join our Online courses: ACCA, HESI A2, ATI TEAS 7 , HESI EXIT , NCLEX – RN and NCLEX – PN, Financial Literacy!🌟 Dive into a world of opportunities and empower yourself for success. Explore more at Serrari Ed and start your exciting journey today! ✨
Track GDP, Inflation and Central Bank rates for top African markets with Serrari’s comparator tool.
See today’s Treasury bonds and Money market funds movement across financial service providers in Kenya, using Serrari’s comparator tools.
photo source: Google
By: Montel Kamau
Serrari Financial Analyst
11th November, 2025
Article, Financial and News Disclaimer
The Value of a Financial Advisor
While this article offers valuable insights, it is essential to recognize that personal finance can be highly complex and unique to each individual. A financial advisor provides professional expertise and personalized guidance to help you make well-informed decisions tailored to your specific circumstances and goals.
Beyond offering knowledge, a financial advisor serves as a trusted partner to help you stay disciplined, avoid common pitfalls, and remain focused on your long-term objectives. Their perspective and experience can complement your own efforts, enhancing your financial well-being and ensuring a more confident approach to managing your finances.
Disclaimer: This article is for informational purposes only and does not constitute financial advice. Readers are encouraged to consult a licensed financial advisor to obtain guidance specific to their financial situation.
Article and News Disclaimer
The information provided on www.serrarigroup.com is for general informational purposes only. While we strive to keep the information up to date and accurate, we make no representations or warranties of any kind, express or implied, about the completeness, accuracy, reliability, suitability, or availability with respect to the website or the information, products, services, or related graphics contained on the website for any purpose. Any reliance you place on such information is therefore strictly at your own risk.
www.serrarigroup.com is not responsible for any errors or omissions, or for the results obtained from the use of this information. All information on the website is provided on an as-is basis, with no guarantee of completeness, accuracy, timeliness, or of the results obtained from the use of this information, and without warranty of any kind, express or implied, including but not limited to warranties of performance, merchantability, and fitness for a particular purpose.
In no event will www.serrarigroup.com be liable to you or anyone else for any decision made or action taken in reliance on the information provided on the website or for any consequential, special, or similar damages, even if advised of the possibility of such damages.
The articles, news, and information presented on www.serrarigroup.com reflect the opinions of the respective authors and contributors and do not necessarily represent the views of the website or its management. Any views or opinions expressed are solely those of the individual authors and do not represent the website's views or opinions as a whole.
The content on www.serrarigroup.com may include links to external websites, which are provided for convenience and informational purposes only. We have no control over the nature, content, and availability of those sites. The inclusion of any links does not necessarily imply a recommendation or endorsement of the views expressed within them.
Every effort is made to keep the website up and running smoothly. However, www.serrarigroup.com takes no responsibility for, and will not be liable for, the website being temporarily unavailable due to technical issues beyond our control.
Please note that laws, regulations, and information can change rapidly, and we advise you to conduct further research and seek professional advice when necessary.
By using www.serrarigroup.com, you agree to this disclaimer and its terms. If you do not agree with this disclaimer, please do not use the website.
www.serrarigroup.com, reserves the right to update, modify, or remove any part of this disclaimer without prior notice. It is your responsibility to review this disclaimer periodically for changes.
Serrari Group 2025





